Heat rejection
Contents |
[edit] Introduction
Waste heat can be produced by any process that uses energy. In buildings, this might include:
- Heating, ventilation and air-conditioning systems (HVAC).
- Refrigeration.
- Machinery, equipment and industrial processes.
Where this waste heat is at a low-temperature, it may have limited useful capacity for work and so it may be rejected to the environment. However, if it is suitable for use in another process, a portion of heat that would otherwise be wasted might be reused. This is known as heat recovery.
Heat rejection methods include, air cooing, evaporative cooling, and ground coupling.
[edit] Air cooling
Air cooling can be as simple as using mechanical or natural ventilation to reject excess heat to the outside.
Typically in heating, ventilation and air-conditioning systems, air cooling rejects heat to the outside air by circulating 'outside' air over coils containing 'hot' fluid returning from the building. Heat is transferred from the coil to the air which is then rejected to the outside. See cooling for more information.
[edit] Evaporative cooling
When water evaporates, it absorbs significant amounts of heat energy (latent heat), which produces a cooling effect in its surroundings.
Direct evaporative coolers (sometimes referred to as sump coolers, swamp coolers, or desert coolers) draw hot, dry air through a continually dampened pad and supply cool, humid air.
Indirect evaporative cooling can be achieved by using a heat exchanger to cool supply air, by spraying water over the cooling coils of a conventional chiller or by cooling towers.
Cooling towers reject heat through the evaporation of water in a moving air stream within the cooling tower. The temperature and humidity of the air stream increases through contact with the warm water, and this air is then discharged. The cooled water is collected at the bottom of the tower. This process can achieve lower temperatures than air-cooled heat rejection systems. See Cooling towers for more information.
[edit] Ground coupling
Earth-to-air heat exchangers draw air through buried ducts or tubes (sometimes referred to as earth tubes). As the temperature of the ground below 3m is practically constant, it can be used to substantially reduce air temperatures. See Earth-to-air heat exchanger for more information.
Open or closed loop water to air heat exchangers, similarly exploit the relatively stable temperature of the earth to provide cool water. See Ground energy options for more information.
[edit] Heat recovery
Heat recovery is the process of collecting and re-using heat that would otherwise be lost. This can help reduce the energy consumption of the process or the heat can be used elsewhere, reducing running costs and carbon emissions. See Heat recovery for more information.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.